Oracle Primavera Techno-Functional Consultant
Closing Date:
March 11, 2021
Responsibilities
- Lead the Oracle Primavera Unifier implementation process from project initiation to project closeout
- Create functional requirements
- Design, document, and develop business processes (BP) design in Unifier
- Collaborate with solution architects on architecture design
- Prepare design documents and work task plans
- Working with the implementation team, you will design migration onto Unifier from other systems and serve as architect and SME on integration efforts to other systems
- Assist in gap analysis and participate in developing solution strategies
- Assist in data conversion strategies
- Support implementation teams in developing Primavera PPM solutions
- Support implementation team in integrating Primavera Unifier and P6 EPPM.
- Develop testing plan, scripts, and procedures
Functional and Technical Capabilities
- 6-8 years of Primavera Unifier & P6 EPPM implementation experience.
- Should have thorough knowledge on Oracle Primavera Unifier & P6 EPPM features.
- Should have experience in core implementation of Primavera Unifier.
- Should have experience in integration with other systems like ERP/ Document Repository Solutions etc.
- Should have a strong understanding of Primavera Web Services and API’s
- Cost analysis & cost engineering experience on EPC projects.
- Expert in uLink, uDesigner, Unifier
- Knowledge of Earned Value Analysis, Cost Forecasting and Contract Management.
- Strong Background in Reports Development, with expertise in Oracle BI Publisher, Primavera Analytics and Oracle Database
- Preferred: knowledge of Construction Management and Cost Control Systems.
Qualifications
- Bachelor of Engineering in Computers / Information Technology / Civil Engineering.
- PMI or AACE certification or equivalent is a plus
- ITIL Foundation Certified
- Experience within the Project & Portfolio Management industry and demonstrated expertise in implementing Unifier.
- Demonstrated knowledge and strength in understanding these Unifier key features and BPs:
- WBS and Cost Control Methodologies
- Procurement and Bid Management
- Estimate, Budget, and Scope Management
- Contract Management and Change Management
- SOV, Invoicing, and Payment Applications
- Cash Flow Curves (Design, Options, Maintenance)
- Candidates must be available locally in Qatar with transferable visa and ready to join immediately.